The Anaklia-Ganmukhuri wooden footbridge is one of the longest pedestrian bridges in Europe (505 meters).

The Anaklia-Ganmukhuri wooden footbridge is one of the longest pedestrian bridges in Europe (505 meters).

Designed by Tragwerksentwurf: Leonhardt, Andrä und Partner, to ensure quality, all glue-laminated timber elements in this project were prefabricated in the Kleinheubach plant. To meet the special requirements and difficult logistical requirements, the patented HESS LIMITLESS solution was used. This allowed the union of the individual elements (a total of 141 unions were made) in Georgia. The resulting beams are an impressive 48 meters long. The maximum free spans of the bridge are 84 metres. The bridge crosses the Enguri River and connects the Georgian resort of Anaklia and the neighboring city of Ganmukhuri.


WEMHONER Surface Technologies

IT MAY INTEREST YOU

Card image cap The nine -storey wooden building that revolutionizes construction: so it is much faster and cheap to build

This housing building project in Toronto (Canada) takes the advantages of the prefabrication of control panels. More information: the skyscraper that will change the construction: wood facade to control the temperature without spending energy

Read news »

Card image cap Batev 2025 began: the meeting point for the construction industry

The 30th edition of the International Exhibition of Construction and Housing has been inaugurated today, consolidating as the main event for innovation, industrialized construction, sustainability and technology in the regions construction sector. The exhibition will be open until June 28, 2025, from 2:00 p.m. to 8:00 p.m., in La Rural.

Read news »

Card image cap A study analyzed the impact of forest fire smoke on cardiovascular health

The investigation was based on data from more than 20 million people and showed the consequences of exposure to fine particles in these events according to the United Nations Organization (UN), forest fires are rapidly increasing in intensity, frequency and duration due to the climate crisis

Read news »

DIEGO LAVISTA LLANOS

LYH PLACAS

VIALRO

LUAN - Ferroplastica Olivos S.R.L.

SERV-INT

ALCE HERRAJES SH

GRUPO EURO

ROSARIO ABRASIVOS SRL

HERRAJES NORTE

JOESCAN

COMBILIFT

PERIN Spa

WEMHONER Surface Technologies

ASERSUR MADERAS

PERFILESLED

METALURGICA PESKINS SCA

FORESTAL LAS MARÍAS SA

ATOR

MADER-EXPO

TAEDA S.A.

PRECOR SA

LIJAS HUNTER